This downloadable case study on Fort Worth, Texas showcases RedZone’s ability to meet the challenges of large diameter interceptor inspection, allowing The City of Fort Worth to prioritize pipeline repair and replacement within their wastewater collection system.
With the use of multi-sensor inspection and NASSCO PACP condition scoring, the RedZone team established that pipe age and material are not necessarily accurate indicators of condition. This resulted in reduced spending and an enhanced understanding of the state of the City of Fort Worth’s sewer system.
- 260 miles of large-diameter interceptor sewers
- $6.86 million cleaning cost reduction
- $26 million in CIP savings